Slow the Flow Field Day - Big Springs
Primary tabs
Date:
27 Nov 2015 - 10:00am
WHEN: 10am –2.00pm Friday 27th November
WHERE: Chris & Jerry Garner’s “Silver Springs”
669 Big Springs Road, Wagga
Take Big Springs Road and travel approximately 3kms. Turn right into the Silver Springs private road and continue for 3kms winding up the valley until you reach the woolshed where we’ll be gathering.
RSVP: Tuesday 24th November
Mardi Pillow 6928 1321/0428 69281 or mpillow@bigpond.com
Morning tea and lunch will be provided
This field day will utilise the collective wisdom of the Kyeamba Valley Landcare Group in conjunction with techniques discussed with Cam Wilson. It is hoped all participants in the project will attend and receive:
- Hands on experience on how to deal with erosion control
- Shaping and protecting a sizeable active headcut using brush and logs
- Vegetation strategies using pole cuttings to halt active erosion and encourage infill of an existing gully
- Using small rocks and timber to “Slow the Flow” in a small wash headwall
- Guidelines as to where their funding can be used (ie. Hire of equipment, purchase of rocks/road base, gabion baskets, fencing, geo-textile fabric, fuel for machinery, trees & plants, gypsum & soil additives)
- Morning tea and lunch!
Dowload the flier below.
Attachment | Size |
---|---|
Slow the Flow Field Day KVLG2.pdf | 944.05 KB |